Industrial Water Process
Page 3 / 5 |
|
|
|
|
|
Treatment of washwater from a
blast furnace's smokes |
|
|
|
Capacity : 2x450 m³/h |
|
|
|
Settling :
specific clarifier with bottom sludge scraper |
|
|
|
|
|
|
Water treatment in a
galvanization factory |
|
|
|
Flow rate : 215 m³/h |
|
|
|
Carbonate removal
HYDROGYR TD |
|
|
|
Filtration through "pressure" horizontals filters. |
|
|
|
Water treatment on secondary lines of
continuous castings |
|
|
|
Capacity of the treatment : 760 m³/h |
|
Filtration through several "pressure" filters. |
|
|
|
|
|
Filtration in derivation
on a cooling line of tinning |
|
|
|
Capacity : 30 m³/h |
|
|
|
|
|
|
|
|
Process water for a
production line in a
glass industry. |
|
|
|
Preliminary treatments before filtration on porous
membranes - flow rate : 40 m³/h
|
|
* |
coagulation |
* |
flocculation |
* |
bacterial removal |
* |
settling with plates on
HYDROPAC |
* |
filtration through sand filters |
* |
chlorine removal on carbon filters |
|
|
Filtration
on porous membranes - system M.B.M. : |
|
* |
Preliminary filtration on ultrafiltration unit
: 40 m³/h |
* |
Filtration on two reverse osmosis units in parallel : 2x15 m³/h
with a conductivity of 25 µS/cm |
|
|
|
|
Ultrafiltration and reverse osmosis are on
the same construction. |
|