Engineering and Services Society in Water Treatment

  HYDRO-TECHNOLOGY Website

 

 Page of references

    Back

 
 

TREATMENT PLANT - LANTIN

 
MASTER OF WORK A.I.D.E. B-4420 Saint-Nicolas
GENERAL CONTRACTOR Entreprises Louis DUCHENE (Modave)
YEAR Prevision of start-up : 2004
PRESTATIONS
· Choice of processes treatments
· Hydraulical and biological calculations
CAPACITY OF TREATMENT
 35.000 E.H.
 4.200 m³/day
 1.890 kg BOD/day
MAXIMUM PERMISSIVE CONCENTRATION
 BOD : 25 mg O2/l
 COD : 125 mg O2/l
 Suspended solids : 35 mg/l
 N : 15 mg/l
 P : 2 mg/l
TREATMENT LINE
· Coarse and fine screening, desilting and oil removal
· Biological treatment by activated sludge with denitrification
· Biological and chemical phosphorus removal
· Settling
· Sludge thickening on mechanical cloth filter
· Rotary pressure filter
 
Plant of LANTIN before modifications (1998)
 
 
 
Plant of LANTIN after modifications (2003)
 
 
     
Previous page

Top

Next page